We received our Lock Up progress payment authority letter in the mail and immediately drove out to our house to see how it was travelling, we are indeed at lock up apart from the front door and garage door not being there. We will be getting a call sometime very soon to arrange a walk through with our Site Supervisor for Lock Up.
The windows look great, just missing the flywire... I think this gets done at a later stage.
**UPDATE 07/10/2011: We have our walk through at 3pm Wednesday 12 October 2011 with our Site Supervisor! Exciting thing about that is, the cabinets, shelving and plumbing fixtures will be in!
 |
Master bedroom window |
 |
Side of house |
 |
Back bedroom 3 and 4 windows |