Our pre-handover meeting is scheduled for 2pm Wednesday, this means key handover will be 16 November 2011! Unfortunately Warren has to go away for a week long job on the 13 November.
So from the list of things to be done, we can now cross out:
Electrical fittings and switches 26/10/11Plumbing fittings ie. taps and handles 30/10/11- Install Shower screens and Mirrors
- Finish off painting to front door etc.
Install range hood to kitchen 26/10/11Install oven to kitchen 30/10/11- Install gas cook top to kitchen
- Install hot water system
- Install Carpets
- Install Horizontal blinds
Tile floors 26/10/11Tile wet areas 23/10/11Pour concrete into garage 19/10/11Pave 1/2 driveway 26/10/11Paving of alfresco 30/10/11- Install Garage Door
- Install flywire
Front of house with 1/2 driveway - still waiting on garage door |
Ensuite shower with plumbing installed |
Taps added to sinks in both bathrooms |
Kitchen with range hood and oven installed |
Kitchen sink with tap installed |
900mm oven installed |
Complete with racks and roasting tray |
Toilets 1/2 installed |
Laundry cabinet with finished tiling and tap |
Laundry / storage cupboard |
Bath with taps installed |
Shower in bathroom |
Bathroom cupboard and sink |
Living room tiling - in desperate need of a clean! |
Alfresco paved and very sandy! |
No comments:
Post a Comment